Enersite – Soluciones Energéticas y Ambientales

SERVICES

Municipal Solid Waste (RSU) Treatment Plants

Landfilling waste is no longer a viable option. Environmental regulations throughout the region require systems that eliminate open dumps and convert waste into resources. Enersite designs, structures and operates RSU treatment plants tailored to the reality and scale of each municipality, under a turnkey model with 20-year operation contracts.

The Process in 3 Stages

1

Sorting and Separation

The plant receives mixed waste. Feeder → bag ripper → ballistic classifier → pneumatic separators → manual sorting. Recovers plastics, cardboard, glass, ferrous and non-ferrous metals, PET and organic fraction.

2

Organic Valorisation

The separated organic matter is transformed into a fourth-generation bio-fertilizer with nutrient, insecticide and fungicide properties for soils. 100% certified organic product with a market in the agricultural sector.

3

Energy from Rejects

Non-recoverable materials are converted into clean energy through pyrolysis or biodigestion, with no methane generation during the process.

Available Capacities

ConfigurationCapacityReference investmentStaff
1 sorting line250 tons/dayfrom USD 4,000,000~55 people/shift
2 sorting lines500 tons/dayfrom USD 6,300,000~111 people/shift
With pyrolysis (RSU + effluents)up to 500 tons/dayfrom USD 5,000,000as per config.

Reference investments. The exact model is defined during each project's diagnosis.

Certified Technology

We work with technology from Becotec Soluções Ambientais (Brazil), distributed exclusively in Latin America by PyBrand Imp. Exp. EAS. INPI Brazil Patent No. 102016026665-3 and CREA No. 2514476755. Developed for mixed Latin American waste with no prior selective separation.

INPI Brazil Patent
CREA 2514476755
IRAM Standards
CDM – UN

Business Model for the Municipality

  • Guaranteed supply of RSU tons (20-year contract)
  • Payment of Fi fee per ton with final disposal
  • Operation managed by the Enersite team and local partners
  • The municipality is relieved of the obligation to operate the landfill
  • Compliance with current environmental regulations
  • Access to carbon bonds and international certifications

How many tons does your municipality generate?

We design the exact plant you need. No over-sizing, no under-sizing.

Request Assessment